Skip to main content

Fusion-welded

Society: ASMEMain Category: MechanicalSub Category: ManufacturingEra: 1930-1939DateCreated: 1930ABB Combustion EngineeringChattanoogaState: TNZip: 37402Country: USAWebsite: http://www.asme.org/about-asme/history/landmarks/topics-m-z/manufacturing---1/-44-fusion-welded-test-boiler-drum-%281930%29Creator: Combustion Engineering Inc., Moses, A. J.
This fusion-welded drum, tested during 1930, was the first in a series tested at Combustion Engineering Inc. that led to the industrial acceptance of welding for the fabrication of boiler drums. Replacing riveting for steam power plants, electric arc fusion welding permitted increased efficiencies through higher working pressures and temperatures and fabrication of larger units of improved safety. Welding was then rapidly extended to fabrication using optimum alloys for pressure vessel and structural application. Papers published by A. J.
YearAdded:
1980
Image Credit: Image source: Engrailhistory.infoImage Caption: Fusion-welded Test Boiler DrumEra_date_from: 1930
Subscribe to Fusion-welded

Innovations

This fusion-welded drum, tested during 1930, was the first in a series tested at Combustion Engineering Inc. that led to the industrial acceptance of welding for the fabrication of boiler drums. Replacing riveting for steam power plants, electric arc fusion welding permitted increased efficiencies… Read More

We hope you enjoyed this essay.

Please support America's only magazine of the history of engineering and innovation, and the volunteers that sustain it with a donation to Invention & Technology.

Donate

Stay informed - subscribe to our newsletter.
The subscriber's email address.